Though still a long way off from opening, Journey of Water is starting to resemble more than piles of dirt in the World Nature neighborhood of EPCOT.
In our last construction update, we noted that some pathways seem to be coming together.
Short concrete pillars are in place where future structures may go.
The structure in the photo above now has concrete at its top and bottom.
Small wooden elements now surround the concrete pillars.
Many sections of the land have been excavated.
There is concrete on the ground around the first structure that was built.
This child-friendly walkthrough attraction will feature several water features. It was originally expected to open this year but will now likely open in 2022.
As always, keep following WDWNT for all of your Disney Parks news, and for the absolute latest, follow WDW News Today on Twitter, Facebook, and Instagram.
The post PHOTOS: Construction Continues on Structures for Journey of Water Inspired by ‘Moana’ at EPCOT appeared first on WDW News Today.